How an Electrical Transformer Core is Made

STEP 1: The Material

Before one can even begin the electrical transformer core construction process, you need to make sure that you’re using the best materials available. The material of choice for electrical transformer core companies is cold rolled grain oriented electrical steel, and Corefficient is no exception.
Corefficient has extensive on-site testing capabilities to ensure that the material we receive from our suppliers has exceptional magnetic flux and permeability properties. Why go through the trouble? It’s simple – the better the material, the easier it will be for the magnetic field of the core to flow. Also, high quality cold rolled grain oriented electrical steel reduces losses by reducing the strength of the eddy current.

STEP 2: Material Prep

Now that we’ve ascertained that we’re working with superior quality material, it’s time to cut the material for construction. For our Step Lap Full MITRE Cores, we make use of top of the line GEORG brand TBA lines for the cutting of electrical steel. For our wound cores, we use our highly versatile TRANCO and AEM machines, allowing us to work closely with our customers and their unique specifications for their core. These fully automated precision cutting lines allow us to complete our construction process with incredible speed.

STEP 3: Assembly

Next stop on the assembly line, we stack the core using our fully automated machine. Within 15-20 minutes, we have full stacks of electrical steel that are ready to be shipped as logs, or further assembled into fully functional transformers. With our Step Lap Full MITRE Cores, they’re moved down the assembly line, where our team performs a series of tests and quality checks including testing on a Yokogawa precision power analyzer.

For our DISTRIBUTED GAP Cores, we offer core annealing services, where we utilize our continuously fed SECO/WARWICK annealing furnace first, through annealing, the transformer cores’ magnetic properties are restored. Second, our core annealing services strive to reduce carbon levels within electrical steel to levels less than .01%. Our core annealing process is proven to increase strength, formability and elasticity to the electrical transformer core.

– For a DISTRIBUTED GAP Core, they are continuously fed through a SECO/WARWICK annealing furnace first. Through annealing, the transformer cores’ magnetic properties are restored. Second, the core annealing service strives to reduce carbon levels within electrical steel to levels less than .01%. The core annealing process is proven to increase strength, formability and elasticity to the electrical transformer core.

How an Electrical Transformer Core is Made

STEP 1: The Material

Before one can even begin the electrical transformer core construction process, you need to make sure that you’re using the best materials available. The material of choice for electrical transformer core companies is cold rolled grain oriented electrical steel, and Corefficient is no exception.
Corefficient has extensive on-site testing capabilities to ensure that the material we receive from our suppliers has exceptional magnetic flux and permeability properties. Why go through the trouble? It’s simple – the better the material, the easier it will be for the magnetic field of the core to flow. Also, high quality cold rolled grain oriented electrical steel reduces losses by reducing the strength of the eddy current.

STEP 2: Material Prep

Now that we’ve ascertained that we’re working with superior quality material, it’s time to cut the material for construction. For our Step Lap Full MITRE Cores, we make use of top of the line GEORG brand TBA lines for the cutting of electrical steel. For our wound cores, we use our highly versatile TRANCO and AEM machines, allowing us to work closely with our customers and their unique specifications for their core. These fully automated precision cutting lines allow us to complete our construction process with incredible speed.

STEP 3: Assembly

Next stop on the assembly line, we stack the core using our fully automated machine. Within 15-20 minutes, we have full stacks of electrical steel that are ready to be shipped as logs, or further assembled into fully functional transformers. With our Step Lap Full MITRE Cores, they’re moved down the assembly line, where our team performs a series of tests and quality checks including testing on a Yokogawa precision power analyzer.

For our DISTRIBUTED GAP Cores, we offer core annealing services, where we utilize our continuously fed SECO/WARWICK annealing furnace first, through annealing, the transformer cores’ magnetic properties are restored. Second, our core annealing services strive to reduce carbon levels within electrical steel to levels less than .01%. Our core annealing process is proven to increase strength, formability and elasticity to the electrical transformer core.

– For a DISTRIBUTED GAP Core, they are continuously fed through a SECO/WARWICK annealing furnace first. Through annealing, the transformer cores’ magnetic properties are restored. Second, the core annealing service strives to reduce carbon levels within electrical steel to levels less than .01%. The core annealing process is proven to increase strength, formability and elasticity to the electrical transformer core.